5 Star Rating
Book a free site visit today: 01625 445 760

Wet Pour Installation

When looking to install wet pour surfaces, there are a few vital steps you must take to ensure you get a smooth, continuous surface that is suitable for children to play. Soft Surfaces have many years experience installing soft fall safety surfaces and have been creating vibrant play areas since 1997.

Wetpour Install Process Explained

For more information on the wetpour installation process, please watch the video below which goes into more detail.

 

Please see transcript below:

 

00:00  Hi guys, it’s Dan from Soft Surfaces here and today we’re going to be explaining how wetpour is installed.

 

00:07  So wetpour surfacing is actually one of the more popular rubber safety surfaces that is sold across the UK, and many people wonder how this flooring is fitted. In this video, we’re going to break down how this is done to give you more of an insight.

 

00:17  The first step that we take when installing wetpour is to ensure the base and edgings are suitable and set at the correct depth. Secondly, we then proceed to lay the recycled SBR base layer. This will vary in depth depending in the specification and the critical fall height.

 

00:35  Finally, once the base is cured, it’s then time to lay the EPDM wearing course layer. This can be installed in various colors, designs, and is often fitted with graphics, such as hopscotches, number and letter snakes, and much more.

 

00:46  Here at Soft Surfaces Limited, we have over 20 years of experience installing these wetpour surfaces across the United Kingdom. So if you’d like any more information about wetpour, make sure to check out our YouTube videos on this, or simply contact us at www.softsurfaces.co.uk.

 

For more information on the wetpour installation process, please get in contact today and we will be in touch to discuss this with you in more detail.

 

Enquire